In the manufacture of small parts
using cross-cutting or cold heading machines, high scrap rates often
result from defective starting material. Testing the initial
material and cutting out the defective sections of wire only
leads to multiple short coils that increase changeover times and
production costs for the parts manufacturer. Instead, the solution
is to inspect the wire immediately before it is cut into small
parts. Defective or unfinished parts are then automatically sorted
as scrap and are not processed further.
Thus, excessive costs of
pre-tested initial material can be avoided.
PRUFTECHNIK
offers a wide selection of eddy
current inspection equipment in different price and capability
categories that can be used for parts inspection.
|